Work Order Tracking in GE Aviation’s Maintenance, Repair and Overhaul (MRO) Facility

GE Aviation ACSC facility using WISER RTLS to increase capacity and improve efficiency

GE Aviation ACSC MRO Facility

WISER’s asset tracking and locating solution helped GE Aviation increase productivity and improve their workflow management by an order of magnitude.

THE PROBLEM: WORKFLOW MANAGEMENT INEFFICIENCIES (SEARCHING FOR PARTS)

At GE Aviation’s maintenance, repair, and overhaul (MRO) facility ACSC, tracking parts and work order flow management was a huge issue and top priority to correct.

 Each day, ACSC checked the status of 2,000+ work orders to set the work priorities for that day. This task would take approximately twelve people three hours each, by manually checking which work orders had made it to which station in the previous day.

What ACSC needed most was an accurate, efficient, and simple location system, to automate the prioritization process and track their workorder’s locations in real time, all the time.

THE SOLUTION: THE WISER ATLAS UWB ASSET TRACKING AND LOCATING SYSTEM

With the WISER ATLAS installed, the daily task that took twelve people three hours each was reduced to just 15-20 min per person. Previously, ACSC had to rely on knowing the final operation that had been performed on a part to estimate its location. Then, they would manually search to find it. With WISER ATLAS, they now have a continuous and accurate overview of all their work orders locations.

GE ACSC evaluated several systems, and ultimately chose WISER ATLAS due to its accuracy, ease of set-up, highly competitive price point, accuracy, ease of setup, and the comprehensive flexibility built into the tracking software itself.

 Read the full use case on pages 10-11, MRO Management News

GE Aviation MRO facility tracing thousands of WIP with WISER RTLS

GE Aviation ACSC MRO Facility Map Tracking WIP

THE RESULTS: IMPROVED PRODUCTIVITY AND INCREASED CAPACITY ON THE PRODUCTION FLOOR

Once implemented facility-wide, the company found that the solution achieved ROI in three months, improved productivity, and increased work capacity; all while increasing worker satisfaction.

One of the biggest challenges in facilities like ours is keeping track of all the moving parts. Prior to installing the WISER System, productivity was lost due to searching for lost or misplaced parts and work orders. Since installing the WISER system productivity has increased by 12 times for production control and we’ve been able to increase our capacity by 15%, and reached ROI in three months.
— -Kyle Mosier, Site Digital Leader, GE Aviation ACSC
Previous
Previous

Asset Tracking in a Clean-Room Biotech Manufacturing Facility

Next
Next

Work-in-Progress in a Metal Finishing Factory