Case Studies
Real-life studies of WISER in action.
See how WISER installations have made a real difference for our customers
GE Aerospace: Maintenance Repair and Overhaul (MRO)
Problem: Checking status of 2,000+ work orders took 12 people 3 hours each day at their Engine Overhaul Facility
Solution: Uses WISER to track parts and improve work order flow management.
Results: Saw a 12x productivity increase for production control. ROI in 3 months
Read More →SWD, Inc: Metal Finisher
Problem: 500+ metal work orders processed daily and some getting misplaced
Solution: Uses a WISER system to track 3600+ metal WIP parts.
Results: "This is the best productivity improvement we’ve done in years."
Read More →Danville Metal Stamping: Metal Manufacturer
Problem: Danville must track hundreds of calibrated gauges for their work in metal forming, milling, welding, laser machining, and electrochemical grinding
Solution: Uses WISER to track hundreds of calibrated gauges
Results: No more lost gauges and finding one takes seconds
Read More →Crystal Group: Ruggedized computer and network equipment manufacturer for Aerospace
Problem: Losing track of 900+ items including 700 gauges that regularly needed recalibration
Solution: Uses WISER to track 200 carts, Government Owned Assets and 700 calibrated gauges
Results: Hours spent every week searching for items now be directed toward production
Read More →